A fleet of membrane-type small-scale LNG carriers has been in service for decades, joined since some years by a fleet of mid-scale LNG carriers as well as LNG bunker vessels.

Strong of 60+ years’ experience, GTT proposes new concepts of small and mid-scale LNG carriers & bunker vessels to owners and shipyards.

The designs are particularly well adapted for:

  • coastal trade
  • regional distribution
  • harbour trade
  • river trade

For specific constraints such as shallow draft or ballast-water-free requests, GTT membrane technologies offer excellent solutions with highest cargo volumes.

Ships equipped with GTT technologies show the highest thermal performance, maintaining the LNG at the coldest temperature at sea and increasing operators’ competitive advantage.

Highlights & key advantages
null

All well-known GTT membrane advantages are incorporated, such as the low and guaranteed Boil-Off-Rate.

null

The best ratio of Cargo-volume vs Gross-tonnage leads to economic vessels and excellent manoeuvring performances.

null

Any cargo capacity may be achieved and, in general, all filling levels are obtained without restrictions.

null

Cargo-tank design pressure is normally proposed at 0.7 barg, as per IGC. Higher pressure can be investigated on request.

null

GTT membrane systems are available for any propulsion system.

null

Operational safety is increased in restricted channels & harbours due to more compact design.

null

Full double-hull (bottom, side and deck)

null

Suitable for multigas application

GTT project assistance

Assistance to owners & operators

  • Project evaluation for ship size & capacity, speed, propulsion,
  • Integrated operating profile requirements,
  • Making full use of the advantages of membrane type LNG carriers.

Assistance to shipbuilders

GTT assists shipbuilders in developing their designs

Assistance to new shipyards

GTT assists newcomers in:

  • Shipyard qualification
  • Design of Cargo-Containment & Cargo Handling Systems
  • Ship design development
  • General arrangement
  • Vessel performance
  • Rules & Regulations
  • Sourcing & makers selection
  • Building methods
Some bunkering vessels equiped with GTT's membrane
'Gas Agility' LNG Bunkering vessel
  • 18,600 m3
  • Delivered in April 2020
  • Construction at Hudong-Zhonghua
  • Mark III Flex 170 kg/m3
  • Bunkering rate: 1,600 m3/h
'Gas Vitality' LNG Bunkering vessel
  • 18,600 m3
  • Delivered in October 2021
  • Construction at Hudong-Zhonghua
  • Mark III Flex 170 kg/m3
  • Bunkering rate: 2,000 m3/h
'Bassavola' LNG Bunkering vessel
  • 12,000 m3
  • Delivered end 2022
  • Construction at Sembcorp Marine
  • Mark III Flex 170 kg/m3
  • Bunkering rate: 2,000 m3/h